I’ve been swamped at work with a couple of pretty big projects, but I got a bit more work done on the injection molder frame and controller. First the controller:
Yup, all wired up and working. I’ve got it heating the chamber and have had it all the way up to 400 degrees. I’ve got a good part of the frame built, as well, but I still have the welding to do. I also have to figure out how I’m going to mount the heating chamber to the frame:
I’m getting there, if a bit slowly.

No Comments